January 2017 operating session

the-crew-2

The January operating session on the Border District saw a crew of six in attendance to kick off the 2017 schedule. The “am” timetable was undertaken, with less trains and a greater focus on “immersive operations” being employed. Roles for the rather warm afternoon were (also from right to left in the above image): Craig – VR crew 1, Geoff – Shunter at Tatiara Downs, Brendan – Station Master/Sheriff at Tatiara Downs, Darren – SAR crew 2, Iain – SAR crew 1. Out of shot (possibly because he was holding the camera/phone) is myself, with the combined VR crew 2 and Train Control role.

Below, VR Train Number (TN) 89 roadside goods can be seen, with Y169 at the head of the train in the distance, centre of image departing Edenhope for Nankiva and Tatiara Downs. The staging area on the Border District is both “open” and “through” – representing the rest of VR system/all points east (Edenhope) and the rest of the SAR system/all points west (Kybybolite). Craig is at the controls of his first working, this being very early in the session, further evidenced by the large number of “staged” trains ready and waiting their turn!

vr-tn-89

the-crew-1-jan-2017

The image above, courtesy of Brendan, captures the usual goings on that typify an operating session on the “District”. From right to left … Iain is at Jameston, sorting his cards for “set outs” and “pick ups”, while Geoff is at Tatiara Downs, breaking and making up trains and shunting wagons. In the other aisle, Darren is charge of a Jet goods and is arriving at Nankiva (hidden behind the backscene), while Craig is at Edenhope/Kybybolite, picking up his train card for his next working. In the foreground, the first “mock up” for the Tatiara District Milling Company” complex can be seen … hopefully to be further progressed this year.

The session was both productive – in terms of showing that the changes/simplifications to trains and workings were successful – and also enjoyable, with the crew focussed on their roles but also up for a bit of banter. With the increased focus on “slowing down and immersing” in operations, greater attention was paid to shunting and blocking trains. Crews also worked hard to ensure points and signals were returned to “protect”, though for some this may be an area for future improvement. Below, the one train from the session that has no shunting (other than a loco change at Tatiara Downs) – the “Overland” overnight passenger from Melbourne to Adelaide – can be seen speeding into Nankiva with double S class locos at the head.

vr-tn-241

geoff-jan-2017

Also provided courtesy of Brendan, the above image zooms in a little closer to the action at Tatiara Downs – both in terms of trains and operators. VR Train Number 339 has arrived at the platform and the single third series X class power is being cut off. Just under Geoff’s arm is a pair of SAR 930s ready to take over, with this train then becoming SAR Train Number 338. While this exchange goes on, Geoff continues to break up and make up trains for points both east and west. Across the aisle, Iain is working the SAR branch at Jameston.

The session did see a few “issues” – a couple of derailments that were a result of operator error or poorly maintained/positioned rollingstock – but it was great that the focus was more about the operations. The signal system worked without failure, with a big thanks to Brendan for some behind the scenes support which will also result in a rolling upgrade program to the entire signalling and interlocking systems on the layout. The image below shows the “through” staging yard concept mentioned earlier to better effect. There are eight through roads that are able to be accessed from either end, and a further ten stub ended roads (six easily accessed by VR trains and four easily accessed by SAR trains). VR Train Number 846 Jet goods can be seen (top left of picture) sneaking into Road 6 and its final destination.

open-staging

brendan-and-geoff-jan-2017

Above, more “operator action” can be seen, with the Sheriff laying down the law at Tatiara Downs and his Deputy dutifully taking note! There is plenty for the team at Tatiara Downs to look after – with terminating and originating trains on both the VR and SAR to look after, as well as through trains dropping off and picking up wagons. Additionally, inter system main line trains swap power at Tatiara Downs, so there is rarely a quiet moment! Across the aisle from Tatiara Downs is Jameston, with the addition of a number of structures in 2016 further enhancing the shunting experience there.

Again, my thanks to the January crew for their attendance and ongoing contribution to the Border District! Below, one of the last workings from the session – the railmotor replacement service, VR Train Number 28 from Tatiara Downs to Portland – can be seen arriving at Border Junction. In the background is the substantial rail served industry of Southern Aggregates, while in the foreground is the train’s eventual destination on the layout – Edenhope.

vr-tn-28

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s